The ADAHRS units need to be mounted in the same axis as the airplane and since the sub-panel sits at an angle I designed a mount for them.
The ADAHRS mount is simple, two extrusion pieces make up the legs and the rest I bent from sheet metal. The second ADAHRS will install above this one in the empty holes.
The side view shows the different lengths of the legs which makes an angle in the mount. This angle allows the ADAHRS to sit straight with the aircraft while mounted on the angled sub-panel.
I added a piece of j-channel to the back to prevent any vibration movement in the plate and thus the ADAHRS unit.
Once the ADAHRS was installed I could finish running the Pitot, Static, and Angle of Attack lines.
I made a small bracket to hold the pitot line Y-fittings. I didn't want to drill any holes in the small flange of the longeron so the bracket actually installs on the instrument sub-panel flange and then a leg bends aft to attach the fittings. Having the Y-fittings allowed me to install 90 degree connectors into the ADAHRS which provides more clearance for the big screen that is going to be installing in front of it. I just need to go back and add silicon tape to the tubes to prevent any abrasion against the outer skin.
Showing posts with label adahrs. Show all posts
Showing posts with label adahrs. Show all posts
Monday, November 17, 2014
Monday, June 23, 2014
Primed
Filling - sanding - filling - sanding - when will it stop!? You know what at some point you just say..it's good enough. I finally reached a satisfactory point in that process and was able to prime the cabin top and it's interface with the fuselage. Yay! It won't be long now and I can move on to something new!
I also installed my ADAHRS but then that came to a stop when I realized the data cable I ordered from Dynon was WAY too long. So I sent it back for a shorter one. I'll finish that install when it arrives and will post about it then.
Dates and Times
Mon 16th -1.0hrs- ADAHRS install
Tues 17th -1.25hrs- Sanded and filled fiberglass
Wed 18th -1.0hrs- Sanded and filled
Sat 21st -6.25hrs- sanded, filled, sanded, masked, prepped and sprayed primer
Sun 22nd -2.5hrs- sanded primer
I prepped the plane by wiping it down with some acetone...very lightly so nothing soaked in. Then I lightly etched and alodined the aluminum and wiped it clean. I also prepped the shop for painting.
I used a high build primer from Sherwin Williams. The normal automotive stuff. easy application and easy sanding. Here is a picture after the sanding. First I sanded with a block and 120grit. Then I switched to 180 in some of the low areas. Then 400 grit everywhere by hand. It gave it a nice smooth finish.
I also installed my ADAHRS but then that came to a stop when I realized the data cable I ordered from Dynon was WAY too long. So I sent it back for a shorter one. I'll finish that install when it arrives and will post about it then.
Dates and Times
Mon 16th -1.0hrs- ADAHRS install
Tues 17th -1.25hrs- Sanded and filled fiberglass
Wed 18th -1.0hrs- Sanded and filled
Sat 21st -6.25hrs- sanded, filled, sanded, masked, prepped and sprayed primer
Sun 22nd -2.5hrs- sanded primer
I prepped the plane by wiping it down with some acetone...very lightly so nothing soaked in. Then I lightly etched and alodined the aluminum and wiped it clean. I also prepped the shop for painting.
Before
After
Tail number painted on!
I used a high build primer from Sherwin Williams. The normal automotive stuff. easy application and easy sanding. Here is a picture after the sanding. First I sanded with a block and 120grit. Then I switched to 180 in some of the low areas. Then 400 grit everywhere by hand. It gave it a nice smooth finish.
Monday, February 24, 2014
ADAHRS Tailcone Tray
A while back I designed a tray to install the Dynon ADAHRS units in the tailcone.
For those of you who don't know these are little boxes that tell the airplane it's speed, altitude, rate of climb, angle of attack, pitch, roll, yaw, etc. They are very sensitive devices that cannot be installed near any magnetic material...more importantly any moving magnetic (ferrous) material. The control rod bolts installed in the lower portion of the tail could cause errors in the readings if installed too close and these are very important readings. The ADAHRS units must also be installed straight and level in relation to the aircraft. A small 1 degree difference is all that is allowed between it and the airplane. Think of these boxes as my airplanes sensing center that tells the brain (EFIS) what's going on. I am installing two of the units one is a backup to the other. The two units constantly cross check each other for full redundancy in the system. If one goes down I flag will pop up on my control screen.
I designed the tray to install in the top of the tailcone hanging from the upper stringers. The tray was made from scrap 6061-T6 aluminum and channel. All the rivets are solid aluminum #3 button head rivets. I used my iPhone's inclinometer to install the tray at the same plane as the door frame longerons which are the straight and level flight reference point on the RV-10. The tray after installation measured in the same plane as the longerons on all axes.
Date and Time
Mon 17th -7.75hrs- Worked on canopy sanding, built and primed the ADAHRS tray.
This is the 3D model I made to design the tray.
I ran an analysis on my design and it easily passes a 10g crash load.
Here are a few pictures of the actual tray. It will be installed with 4 rivets on each side into the upper stringers.
For those of you who don't know these are little boxes that tell the airplane it's speed, altitude, rate of climb, angle of attack, pitch, roll, yaw, etc. They are very sensitive devices that cannot be installed near any magnetic material...more importantly any moving magnetic (ferrous) material. The control rod bolts installed in the lower portion of the tail could cause errors in the readings if installed too close and these are very important readings. The ADAHRS units must also be installed straight and level in relation to the aircraft. A small 1 degree difference is all that is allowed between it and the airplane. Think of these boxes as my airplanes sensing center that tells the brain (EFIS) what's going on. I am installing two of the units one is a backup to the other. The two units constantly cross check each other for full redundancy in the system. If one goes down I flag will pop up on my control screen.
I designed the tray to install in the top of the tailcone hanging from the upper stringers. The tray was made from scrap 6061-T6 aluminum and channel. All the rivets are solid aluminum #3 button head rivets. I used my iPhone's inclinometer to install the tray at the same plane as the door frame longerons which are the straight and level flight reference point on the RV-10. The tray after installation measured in the same plane as the longerons on all axes.
Date and Time
Mon 17th -7.75hrs- Worked on canopy sanding, built and primed the ADAHRS tray.
This is the 3D model I made to design the tray.
I ran an analysis on my design and it easily passes a 10g crash load.
Here are a few pictures of the actual tray. It will be installed with 4 rivets on each side into the upper stringers.
I have a few full size prints to help people make the parts if they want to. You should be able to click the links below and it will download my PDF file from my Google Drive. If you print the PDF on an 11x17 paper it will be full size. Check the measurements on the drawing after you printed to verify it's a true 1:1 scale. These should be all you need along with my pictures above to do the install. Also, a helpful note, after I printed the plate drawing full scale I just spray mounted it to my aluminum sheet and then just cut and match drilled to the printed lines....worked really well.
Link to Bottom Plate Drawing
Link to Side Plate Drawing
Friday, October 25, 2013
Panel Plan Rev 2
I updated the plan. Rearranged the avionics behind the panel, added an independent mini efis, and changed to the Garmin 650.
I swapped the location of the MFD and Garmin box, which has now changed to the GTN 650 to include ILS and VOR capabilities. I also added the AvMap mini efis/adahrs, it's a standalone system completely independent of the Dynon Skyview and has it's own Pitot/Static input for airspeed and altitude readouts. I also added a second iPad mini for passenger (wife) entertainment. Behind the panel mounted iPad will be a small "glove box" storage compartment. The iPad mounted to the center console will be running Foreflight.
This is a diagram showing all the avionics, instruments, and antennas required for the aircraft. This does not include: switches, probes, lights, or sensors. Note changes: Garmin 650 instead of 635 and added the Mini Efis.
This is a diagram showing the location of each component along with other view orientations.
Note:
- All of the components have been moved onto or aft of the subpanel.
- The VP-X will be mounted on a plate that spans the instrument panel lower angle and sub panel lip. This allows easy access to the component for the large quantity of wiring that will be going to it.
- The ribs do not need to be modified. Only the subpanel will need to be modified to allow the GTN 650 installation.
- The Transceiver and Transponder are mounted directly to the existing tunnel cover side by side.
- The new center console will be made from fiberglass and can be relatively thin since the only thing that is installing to it is the iPad mini.
This is the plan for now...and is still subsequent to change at any time : )
I swapped the location of the MFD and Garmin box, which has now changed to the GTN 650 to include ILS and VOR capabilities. I also added the AvMap mini efis/adahrs, it's a standalone system completely independent of the Dynon Skyview and has it's own Pitot/Static input for airspeed and altitude readouts. I also added a second iPad mini for passenger (wife) entertainment. Behind the panel mounted iPad will be a small "glove box" storage compartment. The iPad mounted to the center console will be running Foreflight.
This is a diagram showing all the avionics, instruments, and antennas required for the aircraft. This does not include: switches, probes, lights, or sensors. Note changes: Garmin 650 instead of 635 and added the Mini Efis.
This is a diagram showing the location of each component along with other view orientations.
Note:
- All of the components have been moved onto or aft of the subpanel.
- The VP-X will be mounted on a plate that spans the instrument panel lower angle and sub panel lip. This allows easy access to the component for the large quantity of wiring that will be going to it.
- The ribs do not need to be modified. Only the subpanel will need to be modified to allow the GTN 650 installation.
- The Transceiver and Transponder are mounted directly to the existing tunnel cover side by side.
- The new center console will be made from fiberglass and can be relatively thin since the only thing that is installing to it is the iPad mini.
This is the plan for now...and is still subsequent to change at any time : )
Labels:
adahrs,
avionics,
Dynon,
Efis,
Garmin 650,
Instrument Panel,
ipad,
radio,
RV-10,
skyview
Subscribe to:
Posts (Atom)