Friday, March 27, 2015

3 Years of Building an RV-10 (1807.25 hrs)

Catching up on my worked hours. Lots and lots of hours....
Scroll down for the interesting stuff.

Nov
21 7.0 hrs
22 4.0 hrs
23 5.0 hrs
Dec
2 1.3 hrs
3 1.0 hrs
6 6.5 hrs
7 4.5 hrs
9 1.0 hrs
10 1.0 hrs
13 5.0 hrs
14 5.0 hrs
15 0.8 hrs
17 1.0 hrs
18 1.3 hrs
20 4.5 hrs
22 4.5 hrs
30 1.5 hrs
Jan
1 2.5 hrs
2 4.0 hrs
3 5.0 hrs
4 6.0 hrs
6 1.3 hrs
7 1.3 hrs
10 6.0 hrs
11 6.0 hrs
12 1.5 hrs
13 2.3 hrs
14 1.3 hrs
16 9.0 hrs
17 5.0 hrs
18 5.0 hrs
19 5.0 hrs
21 2.0 hrs
23 2.5 hrs
24 6.0 hrs
25 5.0 hrs
26 1.5 hrs
27 1.5 hrs
28 2.0 hrs
29 1.0 hrs
31 7.0 hrs
Feb
1 4.0 hrs
7 5.0 hrs
8 3.0 hrs
9 1.3 hrs
10 1.3 hrs
11 1.3 hrs
13 8.0 hrs
14 4.0 hrs
15 0.0 hrs Moved parts for paint
16 5.5 hrs
18 1.0 hrs
21 5.0 hrs
22 4.0 hrs
28 6.0 hrs
March
1 5.0 hrs
4 1.5 hrs
5 4.0 hrs
6 7.0 hrs
7 6.0 hrs
8 6.0 hrs
9 1.3 hrs
10 1.5 hrs
11 1.3 hrs
14 7.0 hrs
15 5.0 hrs
16 8.0 hrs Week of Wiring
17 8.0 hrs Week of Wiring
18 6.0 hrs Week of Wiring
19 7.0 hrs Week of Wiring
20 11.0 hrs Week of Wiring
21 6.0 hrs
22 6.0 hrs
23 291.0 hrs   3 Year Mark (1802.75 hrs Total Time)

24 2.0 hrs
25 2.5 hrs
295.5 hrs                           (1807.25 hrs Total Time)


Since I hit the 3 year mark lets play around with some numbers and milestones...
 -------------------------------------------------------------------------------------------------------------------------
March 23 2012 - Started Building - Time 0.0 hrs
Just a bunch of parts.

Ayla Picture form this time.
....um...she wasn't made yet

---------------------------------------------------------------------------------------------------------------------
March 23 2013 - Total Time 587.25 hrs
Completed the tail structure, almost all of the fuselage aluminum structure was finished, and I was well into the wings. Working on the fuel tanks, I think.

Ayla Picture from this time.

-------------------------------------------------------------------------------------------------------------------------
March 23 2014 - Total Time 1081.75 hrs
Wings finished and stored away in the loft. The plane is on landing gear, doors are fit and cabin top is installed.

Ayla Picture from this time.

------------------------------------------------------------------------------------------------------------------------
March 23 2015 - Total Time 1802.75 hrs
Engine is hung, most of the firewall forward is complete. The wings were fit checked and the tail was on and fully completed. Both of those parts are out for paint. Landing gear was completed. Engine cowling was completed. Lots of wiring was completed.



Ayla Pictures from this time. She's grown a lot in the past year!

--------------------------------------------------------------------------------------------------------------------------
Now for the math fun...
Year One (2012-2013) -  587.25 hrs = 48.94 hrs per month = 11.3 hrs per week.

Year Two (2013-2014) - 494.5 hrs = 41.2 hrs per month = 9.5 hrs per week 
       (16% decrease in time from the previous year)

Year Three (2014-2015) - 721 hrs = 60.08 hrs per month = 13.9 hrs per week
       (46% increase in time form the previous year)
       (23% increase from year one)

.....wow...looks like I really want to get this thing done. And I bet the last 4 months or so is responsible for the majority of the spike in hours!

Total Time (2012-2015) - 1802.75 hrs = 50.08 hrs per month = 11.6 hrs per week.

No comments:

Post a Comment