Showing posts with label Vent Lines. Show all posts
Showing posts with label Vent Lines. Show all posts

Monday, April 22, 2013

Tube Flaring - Fuel Tanks #11

April 17th 1.25hrs
Obviously this post is a little behind, but I've been busy, and secretly I'm further along than this post shows....but that's for another post on another day.

I flared the vent lines using this tool:
It's a Parker 212FB Rolo-Flair 37° Manual Rotary Flaring Tool and it works great! It comes with a small writeup of instructions, although, it's rather intuitive. Play around with the thing for a few minutes and you're a pro.

I checked the flare against this spec:
and it was dead on....a perfect flare.

I followed this spec for torque:



You can easily work on the vent line with the Inboard Rib in place.

Nice flare.


I cleaned the inside of the tanks with Acetone and inspected the seals and added Proseal anywhere I thought necessary.




Random pic of the baby.
APPLESAUCE!

Wednesday, April 17, 2013

Fuel Tanks Post #10

If my counting skills are correct I think this is the 10th post that deals with Fuel Tanks. Last night was a productive evening. I went through the tanks and applied extra sealent where I thought it needed it. I got the last rib prosealed and riveted in place. The vent line is cut, with my new cutting tool, and slid into place. The flare tool arrives today so hopefully tonight I can knock that out. If all goes well I might be finishing these tanks this weekend!

Monday 15th - 1.25hrs - Sealed tanks, started bending fuel sending unit wire

Tuesday 16th - 2.25hrs - Sealed tanks, riveted last rib

 
3.5hrs to Fuel Tanks = 61.5hrs total on Fuel Tanks