I only got about an hour in today, but I riveted the ribs onto the forward spar. So far almost all the rivets have had to be installed with the rivet gun instead of the squeezer, due to the size of the spar flange. Not a big deal but it requires a bit more concentration to smash the rivets just right without damaging any if the structure. (1.0)
No comments:
Post a Comment